|
Reconstruction of the existing viaduct over the operating railway line and electric supply line. New road slab with pavements on the ferroconcrete foundation carried out on the steel structure of load-bearing spans of a length of 30 m. The entire works of ferroconcrete road slab and pavements carried out.
|  |
| realisation date | 09-2004 to 04-2005 | | investor | Zarząd Dróg Miejskich | | project | Instytut Badań Dróg i Mostów | | general contractor | POLIMEX – MOSTOSTAL SIEDLCE SA |
|